
3 Commissioning
3.4 Standard set-up
26
Lenze · Servo-Inverter 9400 HighLine · Reference manual · DMS 10.0 EN · 11/2013 · TD05/06
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3.4 Standard set-up
Check & optimise application/DC-bus operation:
1. Traverse axis in manual operation.
•See chap. Basic drive functions
Manual jog ( 395)
2. Check area boundaries (path, speed, torque).
3. Traverse axis in automatic operation with set-up speed, possibly together with coupled axes.
4. Check coupling with other movements (master/slave axes, tools, …).
5. Optimisation of the process at higher speeds.
6. Recording of typical signal characteristics using the oscilloscope function for the documentation.
•See chapter Oscilloscope
( 579)
Save & archive project and parameter set:
1. Execute device command C00002
= "11: Save start parameters".
2. Save »Engineer« project.
3. Deposit a backup copy of the »Engineer« project, e.g. on CD ROM, in the control cabinet.
Worksteps
Worksteps
Transfer application and parameter set to the controller:
1. Transfer the application preconfigured in »Engineer« and the corresponding parameter set to the
memory module of the controller.
2. Execute device command C00002
= "11: Save start parameters".
For a motor with an electronic nameplate (ENP):
3. Restart controller with connected motor to read out the motor data from the electronic nameplate
(ENP).
• Either by switching off/switching on again the voltage supply or by means of device command
C00002
= "11000: Restart controller".
•See chap. Motor interface
Reading out motor data from the controller ( 117)
4. Execute device command C00002
= "11: Save start parameters".
For a motor without an electronic nameplate (ENP):
Note:
The motor is operated with the motor data and plant parameters identified during initial
commissioning. Adjusting motor and controller to each other
( 123)
Comentarios a estos manuales