Lenze EtherCAT Controller-based Automation Manual de usuario Pagina 90

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 205
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 89
7 Commissioning of the system
7.3 Detailed description of the commissioning steps
90
Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. Open the EtherCAT I/O image tab and select the bus cycle task for the master (in so far as
this has not yet happened in the task configuration).
The "Cycle settings of the higher-level bus" serve to use the bus cycle task set via the PLC
settings tab of the Lenze Controller (device):
Vista de pagina 89
1 2 ... 85 86 87 88 89 90 91 92 93 94 95 ... 204 205

Comentarios a estos manuales

Sin comentarios