
11 Defining the cycle time of the PLC project
11.1 Determining the task utilisation of the application
160
Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
11 Defining the cycle time of the PLC project
This chapter provides information on how to ...
•die Determining the task utilisation of the application
( 160);
•das Optimising the system
( 162).
11.1 Determining the task utilisation of the application
In the online mode, the Monitor tab of the Task Configuration shows current status details and
measurements of the cycles, cycle times, and jitters of the tasks contained.
The values are updated in the same time interval as that used for monitoring the values from the
controller.
If the cursor is on a task name field, the values displayed can be reset to 0 by the Reset context menu
command (right-click the task name field).
Comentarios a estos manuales