
PLC Designer V2.x| Lenze Application Samples
Working with the sample projects
9400 HighLine - "LAS_40_INTF_Can_94HL_Speed" sample project
86 L 1.3 EN - 07/2012
4. Update the project by clicking :
• Select the option Rebuild all
• Click the Build button to update the project.
5. Going online
– After a connection to the controller has been established successfully, the following
status is displayed in the Status line:
6. Download parameter set
– This command causes parameter settings in the controller to be overwritten by
parameter settings of the »Engineer« project.
Comentarios a estos manuales