Lenze PLC Designer V2.x Manual de usuario Pagina 105

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 336
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 104
1.3 EN - 07/2012 L 105
PLC Designer V2.x| Lenze Application Samples
Working with the sample projects
9400 HighLine - "LAS_40_INTF_Can_94HL_TabPos" sample project
4. Update the project by clicking :
Select the option Rebuild all
Click the Build button to update the project.
5. Going online
After a connection to the controller has been established successfully, the following
status is displayed in the Status line:
6. Download parameter set
This command causes parameter settings in the controller to be overwritten by
parameter settings of the »Engineer« project.
Vista de pagina 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 335 336

Comentarios a estos manuales

Sin comentarios