L-force | PLC Designer
The Individual Components
124 DMS 3.2 EN 02/2011 TD29
configure ENI: This button opens the first of three ENI configuration dialogs:
Each object of a project, which is determined to get managed in the ENI data base, can
be assigned to one of the following data base categories: 'Project objects', 'Shared
objects' or 'Compile files'. For each of these categories a separate dialog is available to
define in which data base folder it should be stored and which presettings should be
effective for certain data base functions:
Dialog ENI configuration / Project objects
Dialog ENI configuration / Shared objects
Dialog ENI configuration / Compile files
Note!
Each object will be stored also locally (with project) in any case.
The dialog will open one after the other if you are doing a primary configuration. In
this case a Wizard (Button Next) will guide you and the settings entered in the first
dialog will be automatically copied to the other ones, so that you just have to modify
them if you need different parameter values.
If you want to modify an existing configuration, then the three dialogs are combined
in one window (three tabs).
If you have not yet logged in successfully to the data base before, then the Login
dialog will be opened automatically.
Note!
The settings will be stored in the project.