Lenze Engineer v2.21 Manual de usuario Pagina 200

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 312
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 199
Defining the system functionality
Creating an interconnection via the electrical shaft
200
Lenze · Engineer · 2.13 EN - 10/2014
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
If it is an axis-related measuring system, the global machine constants ("machine parameters")
are shown in the Edit measuring system dialog box:
Note!
If you click the Accept button in the case of an axis-related measuring system, the
changes made have a direct effect on the corresponding machine parameters of the
drive interface.
Input field Info
Name Optional text
• The first 16 characters are represented by the parameters of the function
blocks in the drive.
Description Optional text
• The description entered is only provided in »Engineer«.
Number Consecutive number that is automatically allocated by »Engineer« and is used
for assigning an address to the measuring system in the drive.
• If an FB (e.g. the "L_CamGetAxisData" FB) of this measuring system is to be
used, the number shown in this field is to be transferred to the FB via its
dnAxisNumber input.
Traversing range Selection of the traversing range in accordance with the desired mechanics.
• If you want to use this measuring system for the x axis in the »Cam editor«,
set "Modulo" as traversing range!
Unit Selection of the unit
With the help of the user-defined unit, informative production units such as
"bottles" can be set.
Select the "User-defined" entry as the unit and then enter the desired user-
defined unit in the User-defined unit input field.
Vista de pagina 199
1 2 ... 195 196 197 198 199 200 201 202 203 204 205 ... 311 312

Comentarios a estos manuales

Sin comentarios