Lenze EY System cables and system connectors Manual de usuario Pagina 24

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 887
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 23
Product description
System cables
Dimensioning of the motor cables
2
l
24
EDSYPFLD EN 8.0
2.1.3 Dimensioning of the motor cables
I Tip!
If several system cables are specified, the cable with the smallest cross−section
is sufficient.
Motor cable structure for servo motors
U, V, W, PE Temperature
detection
Required
motor cable
4 cores 2 Cores
· · 6−core
Motor cable structure for three−phase asynchronous motors
U, V, W, PE Temperature
detection
Brake
24 V DC
Brake ³ 180 V DC
Required
motor cable
Switched to the AC side Switched to the DC side
4 cores 2 cores 2 cores 2 cores 2 cores 2 cores 4 cores
··
6−core
· ·
· ·
· ·
· ·
· · ·
8−core
·· ·
·· ·
·· ·
· ·
· · · 10−core
Brake switch/brake rectifier in the control cabinet
Brake switch/brake rectifier in the terminal box of the motor
Vista de pagina 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 886 887

Comentarios a estos manuales

Sin comentarios