Lenze c300 Manual de usuario Pagina 81

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 195
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 80
11 Remote maintenance and diagnostics
11.1 Status LEDs of the Controllers
81
Lenze · Controller | Parameter setting & programming · Reference Manual · DMS 1.5 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Depending on the running software application, different control modes of the LEDs are possible.
green constantly on Controller is running (operating status):
PLC project is running (device is running, operating status)
blinking
(0.5 Hz)
Starting process of the Controller active
green Yellow blinking
(0.5 Hz)
User action required:
"Load PLC project": PLC started, project is not running
Remove USB flash drive
Status 2
--No function
* Device-dependent LED colour: Either green or blue
Online help for »Backup & Restore«
Here, further information on the »Backup & Restore« specific LED signals can be found.
LED
Colour 1 / colour 2
Interval Meaning
Vista de pagina 80
1 2 ... 76 77 78 79 80 81 82 83 84 85 86 ... 194 195

Comentarios a estos manuales

Sin comentarios