Lenze L-force I/O System 1000 Manual de usuario Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 99
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
L-force Controls | I/O System 1000
Configuring the station structure
Creating a new project (select component from catalogue)
18 L 2.0 EN - 11/2010
3.2 Creating a new project (select component from catalogue)
You can create a new project in the »Engineer« without being online. After having
configured the project, go online with the I/O system 1000 to transfer parameters.
How to create a new project with components:
1. If the start-up wizard has not been displayed yet, click the icon or select the
FileNew... command to call the start-up wizard.
Step 1 - What would you like to do?
2. Select the Select component from catalogue option.
3. Press Next.
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 98 99

Comentarios a estos manuales

Sin comentarios