Lenze PROFIBU PC-based Automation Manual de usuario Pagina 61

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 69
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 60
DMS 2.2 EN 07/2011 TD17 L 61
Control technology | PROFIBUS communication manual
Defining the minimum cycle time of the PLC project
Optimising the system
9.4 Optimising the system
How to optimise the system:
1. Log in and load project.
2. Check the task processing times.
3. Optimising the cycle times:
If required technologically, the cycle times of the remaining tasks with lower
priorities can be decreased.
Condition: No task with a low priority must assign more than 60 percent of the
corresponding cycle time in its task utilisation.
Vista de pagina 60
1 2 ... 56 57 58 59 60 61 62 63 64 65 66 67 68 69

Comentarios a estos manuales

Sin comentarios