Lenze GPA servo planetary geared motors Manual de usuario Pagina 16

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 23
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 15
Commissioning
Before switching on
6
16
BA 12.0030 EN 2.0
6 Commissioning and operation
Stop!
The drive may only be commissioned by skilled personnel!
6.1 Before switching on
Check:
ƒ Is the mechanical fixing o.k.?
ƒ Are the electrical connections o.k.?
ƒ Are all rotating parts and surfaces, which may become hot, protected against
contact?
6.2 During operation
ƒ During operation, check the drive periodically and take special care of:
unusual noises or temperatures,
–leakages,
loose fixing elements,
the condition of the electrical cables.
ƒ If any interfer ence should occur, proceed according to the troubleshooting list in
chapter 8. If the interference cannot be eliminated, please contact the Lenze Service.
Show/Hide Bookmarks
Vista de pagina 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 22 23

Comentarios a estos manuales

Sin comentarios