E84AYCEC communication manual (Ethernet POWERLINK)
Commissioning
Initial switch-on
42 L EDS84AYCEC EN 3.0 - 09/2012
Initial switch-on and diagnosing
1. Switch on the controller and check whether it is ready for operation using the
diagnostic LEDs of the communication module.
Red diagnostic LEDs must not be on.
The following signalling should be visible:
2. If not already done, load the EPL configuration into the controller.
3. Repeat steps 1 and 2 for all EPL nodes.
4. Start network.
The network starts automatically if you set the managing node last.
Otherwise there are two options:
Switch off the network nodes and switch them on together or
execute a fault reset on the managing node (EPL address 240).
5. Check the EPL network again using the diagnostic LEDs of the communication
module.
The following signalling should be visible:
LED Colour Status Meaning
MS Green On Module Status Module status displays
( 54)
DE - Off Device Error
X251 Green On LED is lit if a connection to the node has been established.
Status displays at the RJ45 sockets (X251, X252)
( 56)
X252 Green On
LED Colour Status Meaning
MS Green On Module Status Module status displays
( 54)
ME - Off Module Error
BE - Off Bus Error
DE - Off Device Error
BS Green On Bus Status Fieldbus status displays
( 55)
X251 Green On LED is lit if a connection to the node has been established.
Status displays at the RJ45 sockets (X251, X252)
( 56)
X252 Green On