Lenze EMB934x Manual de usuario Pagina 129

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 206
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 128
Commissioning
Initial switch−on
6
129
EDBMB9340 DE/EN/FR 12.0
6 Commissioning
6.1 Initial switch−on
Stop!
ƒ Prior to initial switch−on check the completeness, polarity, short circuit and
earth fault of the drive system wiring.
ƒ Keep to the switch−on sequence!
1. If 935x brake choppers are integrated into the drive system:
– Ensure the mains supply is switched−off.
– Use switches S1 and S2 to adapt the 935x brake chopper to the mains voltage (see
documentation for the brake chopper).
2. Switch on the mains.
– The drive system will be ready for operation after approx. 0.5 s.
3. Control the readiness for operation via both LEDs at the front of the regenerative
power supply module:
Status Description
green red
on off l The regenerative power supply module is connected to the mains voltage and is ready for
operation.
l No faults.
off on Active fault
off off l Mains voltage is switched off
l Mains phase L2 or L3 failed
4. Adapt all controllers which are connected to the drive system to the mains voltage
(under C0173).
Vista de pagina 128
1 2 ... 124 125 126 127 128 129 130 131 132 133 134 ... 205 206

Comentarios a estos manuales

Sin comentarios