Lenze ECSCExxx Manual de usuario Pagina 106

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 164
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 105
Installation check5
106
EDKCSCE040 DE/EN/FR 3.0
5 Installation check
After completing the installation, check ...
ƒ The wiring for completeness, short circuit and earth fault.
ƒ The power connection:
Mains connection via terminals L1, L2, L3 (X21)
Connection of RFI filter / mains choke
Connection of brake resistor (internal/external) via terminals BR0, BR1
(X22)
Polarity of the DC−bus voltage supply via terminals +U
G
, −U
G
(X22)
ƒ Control connection (X6):
Supply of 24 V supply, GND
Thermal detector contact of external brake resistor or bridge if internal
brake resistor is used at terminals T1, T2.
Wiring adjusted to the signal assignment of the control terminals.
ƒ Communication via system bus (CAN).
Note!
The next step is the commissioning. Relevant information can be
found in the detailed documentation of the power supply module.
ƒ Read the detailed documentation before switching on the power
supply module!
ƒ Perform the commissioning according to the instructions in the
detailed documentation!
Vista de pagina 105
1 2 ... 101 102 103 104 105 106 107 108 109 110 111 ... 163 164

Comentarios a estos manuales

Sin comentarios