
1 About this documentation
1.1 Document history
6
Lenze · Controller-based Automation · PROFIBUS® Communication Manual · DMS 4.3 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.1 Document history
Version Description
1.0 05/2009 TD17 First edition
2.0 10/2009 TD17 General revision
3.0 10/2010 TD17 Commissioning and configuration with the Lenze »PLC Designer« V3.x
3.1 03/2011 TD17 Revision on the Lenze automation system"Controller-based Automation",
Release 3.1
3.2 12/2011 TD17 Revision on the Lenze automation system"Controller-based Automation",
release 3.2
3.3 07/2012 TD17 Revision on the Lenze automation system"Controller-based Automation",
release 3.3
4.0 11/2012 TD17 General corrections
New layout
4.1 03/2013 TD17 Revision on the Lenze automation system"Controller-based Automation",
Release 3.5
4.2 11/2013 TD17 Revision on the Lenze automation system"Controller-based Automation",
release 3.6
4.3 04/2014 TD17 Revision on the Lenze automation system"Controller-based Automation",
release 3.8
Comentarios a estos manuales