Lenze HMI for visualisation / with control technology Manual de usuario Pagina 92

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 96
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 91
Maintenance
Battery replacement
9
92
LDCDS−EL100 EN 9.0
How to proceed:
1. Remove all connected cables and the SD card.
2. Remove the device and put it face−down on a table.
Make sure that the display is not damaged by parts on the table.
3. Remove PC housing:
0
1
1
1
1
0
0
2
3
0
EL100−035
– Loosen 4 screws . Do not loosen screw !
– Loosen 4 screws .
– Carefully remove the housing . Please observe that the housing is connected to
the baseboard by a cable (PE connection ).
4. Exchange battery:
4
EL100−036
– Remove the dead battery from the unit.
– Insert new battery with the positive pole up.
5. Mount PC housing:
– Carefully put the housing onto the baseboard. The PE cable must not be bent in
the process.
– Insert and tighten 4 screws and 4 screws .
According to European legislation you are obliged to dispose of batteries separately, using
the take−back systems specified.
Vista de pagina 91
1 2 ... 87 88 89 90 91 92 93 94 95 96

Comentarios a estos manuales

Sin comentarios