Lenze PLC Designer Migration PLC Designer (R2-x)-PLC Des Manual de usuario Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 30
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
Lenze · PLC Designer | Migration of V2.x projects · 1.2 EN - 02/2013 19
Update of a project from V2.x to V3.x
Import of the example project into the »PLC Designer« V3.x
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7.2 Import of the example project into the »PLC Designer« V3.x
How to import a V2 project into the »PLC Designer« V3.x:
1. Start»PLC Designer« V3.x.
2. Open the »PLC Designer« V2 project (FileOpen project):
Select file extension *.pro (CoDeSys projects (before V3.0).
3. Convert devices
Replace the target system set in the V2 project by a corresponding V3 target system.
Note: You have the option to save the assignment for future projects: Activate the control
field to replace the target system automatically by this V2 target system during the next
project import.
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 29 30

Comentarios a estos manuales

Sin comentarios